Sustainabilities Case study

REFURBISHING FOR THE FUTURE

PROJECT WAVE

CONFIDENTIAL UK LOCATION | LIVE BUSINESS-CRITICAL REFURBISHMENT

Early-1990s technical broadcasting facility.
Ground and first-floor transformation.
MEP delivered by MCS.


Modern open-plan office with desks, task chairs and planted storage units

The Project

A live, business-critical technical facility transformed into modern accommodation for occupational health, contact-centre, digital, cyber and risk functions. (Air Handling Unit) to manage static pressure and prevent water ingress into the unit.

MCS Role

MCS acted as MEP subcontractor and engineering delivery partner, validating existing services, retaining useful assets and targeting upgrades where they added clear value.


The Challenge

Live Interfaces

Reconcile new layouts and technical requirements with existing services whose condition, capacity and record accuracy could not be assumed.

Constrained Space

Deliver isolations, retained services and new installations safely while the wider facility remained operational and business critical.

Evidence Gap

Improve comfort, control and resilience without defaulting to wholesale replacement, overdesign or unnecessary capital intervention.

  1. Validate
  2. Retain
  3. Right-Size
  4. Upgrade
  5. Verify

MCS used engineering evidence to preserve embedded value and focus investment only where performance required it.

Delivery

What MCS Delivered and Protected

Coordinated MEP delivery that protected performance, programme certainty and sustainability outcomes.

Retain Before Replace

Retained or refurbished five FCUs, 47 grilles and two AHUs, preserving 54 MEP assets and avoiding unnecessary replacement.

Adaptable Infrastructure

Rationalised technical demand by 8.75 kW and limited the net UPS increase to approximately 7.5 kW, avoiding wholesale central replacement.

Coordinated Systems

Delivered targeted ventilation, VRF heat pumps, LED lighting, water services, life-safety modifications, controls and recommissioning.

Resilience and Controls

Integrated DALI capability, occupancy detection, Casambi wireless control, BMS scheduling, leak detection and point-of-use hot water.

MCS Sustainability Approach

  1. 1

    Validate

    Compare records with installed condition, capacity and controls.

    Reduce uncertainty and create confidence for safe reuse.

  2. 2

    Retain

    Keep safe, serviceable assets and infrastructure in use.

    Preserve embedded value and avoid replacement carbon.

  3. 3

    Right-Size

    Use calculations to match plant, power and layouts to need.

    Avoid overdesign, excess capacity and material demand.

  4. 4

    Upgrade

    Target efficient new systems only where performance requires.

    Focus investment on comfort, control and resilience.

  5. 5

    Verify

    Test, commission and document retained and new systems.

    Turn design intent into reliable performance and evidence.

Measured Outcomes

Carbon and Efficiency Results

Clear reuse, resource and efficiency outcomes with transparent evidence boundaries.

MCS Headline Results

54

MEP assets retained

Five FCUs, 47 grilles and two AHUs retained, relocated or refurbished.

16.86 tCO2e

Quantified lifecycle reuse benefit

Conservative partial total; excludes unquantified grilles, AHUs and floor panels.

13.35 tCO2e

Quantified upfront reuse benefit

Confirmed floor-pedestal reuse plus conservative five-FCU proxy.

100%

Project-wide landfill diversion

75.18 tonnes recorded; 99.54% recycled and 0.46% energy recovery.

1.92 tCO2e

Estimated pallet-return benefit

240 effective returns using a cautious net factor of 8 kgCO2e per pallet.

39.5 kg

Single-use plastic reduction

Calculated project reduction supported by lower-wrap delivery measures.

MCS Efficiency and Circularity in Practice

Operational Efficiency

Heat recovery, VRF heat pumps, efficient LEDs, occupancy controls, BMS scheduling and recommissioning support lower operational demand. No measured post-occupancy saving is claimed.

Material Efficiency

Retaining 54 MEP assets, reusing suitable power infrastructure, returning pallets and reducing wrapping preserved resources and avoided unnecessary replacement.

Delivery Learning

Approximately 300 consolidated deliveries and an assumed 80% pallet return or reuse rate created a cautious, transparent supply-chain estimate.

Important: reuse, pallet, waste and operational figures use different evidence bases.
They are not combined into one overall project carbon saving.

THE OUTCOME

CLIENT VALUE

The commercial, operational and environmental value created through refurbishment-first MEP delivery.

MCS VALUE DELIVERED TO THE CLIENT

LOWER-CARBON DECISIONS

Evidence-led reuse retained 54 MEP assets and delivered quantified carbon benefit without assigning value to unverified items.

REDUCED DELIVERY RISK

Surveys, calculations, condition checks, safe isolations and recommissioning protected continuity in a live technical workplace.

FUTURE ADAPTABILITY

Wireless controls, adaptable zoning and retained underfloor systems support future workplace change with less disruptive intervention.

GREATER RESILIENCE

Demand rationalisation limited the net UPS increase, while leak detection and local hot water reduced infrastructure and operational risk.

STRONGER EVIDENCE

Clear separation of verified, modelled and estimated outcomes gives the client a credible basis for reporting and future decisions.

PERFORMANCE PROTECTED

ATesting, balancing, BMS checks, trend evidence and updated O&M information supported reliable handover and maintainability.

The MCS Difference

MCS preserved value before adding new value

By validating first, retaining where safe, right-sizing new systems and documenting outcomes transparently, MCS delivered a lower-impact refurbishment without discarding the value already embedded in the building.

Validate first / retain where safe / right-size new systems / protect live operations / verify outcomes

Refurbishing for the Future

Evidence and Interpretation

The quantified reuse total is deliberately conservative. No carbon value is assigned to retained grilles, refurbished AHUs or floor panels. Project-wide waste is not claimed as an MCS-only outcome, and operational benefits remain unverified without before-and-after data.

Source basis: MCS surveys, calculations, delivery tracking, commissioning and project waste records, as summarised in the full Project Wave Sustainability Case Study.